Navío Santísima Trinidad
por: Paul Viant

 
1  2  3  4  5  6  7  8  9  10
11  12  13  14 

Abril 2003
April 2003


6. Frames glued to false keel and dummy cannon support strips in place.


7. Another view showing the glue still wet.


8. Dummy cannon support strips painted matt black.


9. Section of planked deck in place.


10. Close up of deck planking, which is 0.6 mm x 4.0 mm Tanganyka strip, cut into 80mm lengths and arranged in a 3 butt shift pattern. the planking was then lightly sanded and a coat of matt varnish applied.


 Anterior  Home  Siguiente