Navío Santísima Trinidad
por: Paul Viant

 
1  2  3  4  5  6  7  8  9  10
11  12  13  14 



21. Second planking between wales done in Pear Wood. Note also the Solid Oak stand.


22. Second hull planking, alas a failure.  Myself and Bagoas not happy with it so it all came off.


23. Copper plates replace the second hull planking, notice also the gunport surrounds and lids.


24. Internal planking done in Pear wood.


25. Hull covered with copper tiles, from the waterline down, 8 rows, then from keel up.


 Anterior  Home  Siguiente